Sheridan VoTech

This was a very good project for us because it is for a Vocational school. These are the painters of the future. What better way to get our waterborne drying system used. These are the people that will start out in a paying job using water, might as well be using the best drying system out there.

There were some challenges on this installation as with other installs we have done. The box that covers the hips is braced and formed with steel framing. This prevents a problem with the motor mounting. We had to be creative and it turned out flawless.

The other challenge was a slope in the concrete that was too much for our grinding machine. So we had to resort to old fashion scrapers. My back still hurts. Its worth it though, that booth looks like a surgical team could do a brain transplant in there.

Meisner – Paint Popping Refurb

This project was a lot of hard work. Sanding, washing, scraping, and more sanding. The person who previously painted the booth did not put on an epoxy primer. The end result was the paint flaking off the Galvanized panels. We sanded the walls down, power washed everything, and then primed and painted the walls.

The floor was also in bad shape and had lots of overspray coating it. We rented a machine to grind the overspray off and get the floor smooth. Then we coated the floor with 2 coats of a 2part epoxy floor coating.

We replaced door seals, bad light bulbs, and belts for a complete booth refurb.

I hope it lasts them another 15 years to come.